Batch R3 (F-14 through F-19) is implemented and gate-verified. Record
what changed, the measured test counts, and the two things it did not
cover: auto_connect_configured_slots is still serial, and the
operations switch guard still has no production writer.
Also record that the new tests for F-14, F-15 and F-16 were each run
against a mutation restoring the old behaviour and each fails under it,
so they are known not to be tautological.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>